Hyperscale Data Center Fitout

Frankfurt am Main

International hyperscale operator

Cage installation: aisle between two rack rows under yellow fibre trays

Complete fitout of 3 data halls, totaling 4,500 m², from substructure to turnkey handover.

Duration
14 weeks
Area
4,500 m²
Racks installed
450
Result
On-time handover, PUE 1.28
  • Raised floor installation
  • 2N+1 power supply
  • Cold aisle containment
  • Data Hall Fitout
  • Infrastructure Installation
  • BMS Installation

Data center services in Frankfurt

Projects
50+
Locations
12
Availability
99.9%
On schedule
100%

More projects

UPS Modernization

Munich

Leading European colocation provider

Replacement of 6 UPS systems during live operations, without interruption to critical systems.

  • Zero-downtime migration
  • STS integration
  • Infrastructure Installation
  • Maintenance & Repair
Duration
8 weeks
Total capacity
3 MW
Result
99.999% availability during migration

DGUV Campaign

Nationwide

Major German data center operator

DGUV inspection at 12 locations with over 15,000 pieces of equipment: centrally coordinated and digitally documented.

  • Coordination across 12 locations
  • Digital test protocols
  • DGUV Inspections
  • Thermography & Analysis
Duration
6 months
Equipment
15,000+
Result
All locations inspected on schedule, 340 deficiencies identified and resolved

Security Upgrade

Amsterdam

Tier IV data center of a financial services provider

Complete renewal of access control and video surveillance for a Tier IV data center with the highest security requirements.

  • Biometric airlocks
  • BMS integration
  • Entry Systems
  • CCTV Surveillance
  • BMS Installation
Duration
10 weeks
Cameras
120 IP cameras
Result
ISO 27001 certification passed

PUE Optimization

Berlin

Mid-sized colocation operator

Comprehensive energy efficiency program across 2 data halls, from analysis to implementation of optimization measures.

  • Airflow analysis
  • Cold aisle containment retrofitted
  • Cooling optimization
  • PUE Optimization
  • Thermography & Analysis
  • Consulting
Duration
4 months
Savings
180,000 EUR/year
Result
PUE reduced from 1.65 to 1.31, 180,000 EUR annual energy cost savings

Server Fleet Troubleshooting

Dusseldorf

Cloud service provider

Diagnosis and repair of over 800 servers after a critical firmware issue, under maximum time pressure.

  • On-site team of 8 technicians
  • 24/7 shift operations
  • Server Hardware Troubleshooting
  • 24/7 Emergency Support
Duration
3 weeks
Servers
800+
Result
98% of servers back online within 72 hours